Skip to content
Manage IT

Automation

From the measurement on site to the customer's signature: what an automated installation company looks like

Nikola CerićFounder & CEO, Manage IT

An installation company in Germany: a measurement taken on site becomes a quote, the quote becomes a work order, and the order is closed with the customer's signature on a phone. What it was like before, what we connected, and what changed in daily work.

The company installs windows and doors in Germany. Work where the measurement is sacred: get two centimetres wrong copying from a notebook into a quote and the mistake stays invisible until the truck with the frames arrives on site. At that point it is no longer a typo but a re-order, a lost week and a customer asking why.

Before we programmed a single line, we sat down and walked through how the work actually runs — step by step, from the customer's call to the last sheet in the folder. That is always the first move, and it always reveals more than a conversation about features.

What a day looked like before the system

The fitter measures the openings on site and writes them in a notebook. In the evening, after work, the owner retypes those measurements into a Word quote. When the customer accepts, an order is created — again by hand, again from the same numbers.

Working and driving hours arrive by message: “today 8 to 16, hour and a half driving”. Someone adds them up at month end. Photos of the finished work stay in the fitter's gallery, where nobody but him sees them. To learn how far three sites have got, the owner calls three numbers.

None of this was a disaster. It all worked — but it all depended on someone remembering to pass the data along. And people forget, especially at five on a Friday.

The rule we built around: data is entered once

Instead of building a “fitters' program” with a feature list, we built one chain in which every step uses what the previous one already entered:

Measuring the openings on site → the quote is built from the measured openings → an accepted quote becomes a work order with a task, a deadline and a location → working and driving hours are logged on site → the finished work is photographed → the customer signs the hand-over with a finger on the phone screen → all of it stays in the archive attached to the same job.

No step asks anyone to retype anything. The measurement entered on site is the same measurement that shows up in the quote and on the order. Correct it once and it is corrected everywhere.

What changed in daily work

The owner sees the state of every site at any moment — without driving there and without calling. That is the first thing everyone notices, because it removes those five or six phone calls a day that never counted as work but were.

Hours and driving are recorded the moment they happen, rather than reconstructed from memory at month end. Settlement stops being night work and becomes a review.

Hand-over is signed and documented on the spot. When the question “was it installed that way” comes up later, the answer is a dated photo and the customer's signature, not an argument.

The time from finished work to invoice gets shorter, because nothing is waiting for paperwork to be gathered — it is already there.

What the owner said after a year

This is part of the owner's public Google review, translated from German:

“A program was developed for my company that is precisely tailored to my needs and the way we work. My fitters and I now use the program daily. Jobs and tasks can be assigned directly, working and driving times recorded, work documented and signed off at the customer. That gives me a good overview of my sites and the current state of the work at any time.”

What is interesting is what that sentence does NOT contain: no mention of speed, design or the number of features. What matters to the owner is the overview — knowing what is going on without having to ask.

What of this transfers to your company

The chain is specific to installation work, the principle is not. If your company has data that gets entered twice — a measurement, a quantity, an address, an hour, a price — that is the first thing to automate. Not because it is the most impressive, but because that is where errors are born.

The second transferable part is the order of play. You do not start with the biggest module but with the step that hurts most. For this company it was retyping measurements; for another it will be crew scheduling or proving the work was done.

The third is the discipline of building the system around the process rather than the process around the system. A company that adapts to the software usually ends up, six months later, running both the software and the old way of working in parallel.

Nikola Cerić

Founder & CEO, Manage IT

More than 10 years of software development experience — in his own company and in major IT companies across the Balkans.

Have a project in mind?

Request a proposal